    CTI remains a key designer and manufacturer for complete ceramic-lined piping systems throughout the coal, power and minerals industries. Our systems include designs that are specific to handling large particulate flows through Coal Pump Suctions to complete large diameter Heavy Media Lines to deal with impact and blow out conditions.

    We also design and build hydraulic/pneumatic transport for sands, base minerals tailings, and/or bottom ash. The individual fitting designs incorporate flexibility, delivering a 10 to 1 extended life.

    Click here to watch the "CTI Company information video"

  • CTI Bottom Ash Systems


    CTI Primary and Secondary Bottom Ash Cyclones, along with the CTI 6" and 8" pneumatic pipe and fittings with 1/2" ceramic liner, has benchmarked a much improved ash system transport from boiler to silo.

    The improved performance has dramatically reduced recurring maintenance man hours as to cyclone repairs, as well as ash pipe and fitting replacement to meet stringent environmental standards.

    Click here to watch the "CTI Company information video"

  • CTI Process Piping


    CTI Coal and Mineral Ceramic Process piping is a versatile and cost effective solution to pumping high volume solids on a 24 x 7 process schedule. By detailing a carbon steel, Schedule 40 Pipe Standard with ceramic, we are able to design for specific wear problems that large particle, dense medium processes create in a predictable and cost effective standard.

    Click here to watch the "CTI Company information video"

  • CTI 24x7 Coal & Mineral Process Distributors


    Coal and mineral process requires accurate stage distribution of the process flow. In most cases, coal and mineral slurries are pumped and directed to primary process equipment. Cyclone feeds are one of the most critical in maintaining a balanced, even flow from distribution point to process equipment. Distributors may be as little as a 2-way to as many as a 31-way arrangement.

    Material flow wear is very aggressive and high wear normally requires maintenance in less than a year to traditional steel distributors. The CTI ceramic lined distributors will see five to ten years life on a 24x7 process schedule.

    Click here to watch the "CTI Company information video"

  • CTI OEM Replacement Cyclones


    The heavy media cyclone circuit continues to be the choice circuit as to the coal preparation process. We are now processing nominal 3" by 1/4" coarse flows. The flow impact and wear is aggressive. We can design to tweak wear and separation performance. We supply complete cyclone arrangements as well as component parts.

    Our plant is located in the heart of the coal fields. We will pick up and evaluate your cyclone for full replacement or repair parts as needed. We guarantee accuracy of parts fabricated at 1/16". In 28 years, we have never failed to deliver parts which meet our customer's expectations.

    Click here to watch the "CTI Company information video"

  • CTI Bottom Ash Fittings


    8" and 10" CTI Bottom Ash pipe fittings with removable wear backs are lined with 1" ceramic tile to combat small particle, high velocity wear. We see up to five times the life of OEM high chrome parts at the present time. By eliminating wear pockets that result in partial plugging, our fittings keep flow FPS consistent. This cuts down the potential for gas and dust explosions which can happen when velocities are slowed.

    Click here to watch the "CTI Company information video"

  • CTI Suction & Pump Discharge


    CTI Sump to Pump intake suctions are set up to install and provide maximum cross section flow to mineral process pumps handling a full range of 3" to 1mm particle size.

    The flow to pump intake is typically schedule 40 pipe with 1/2" tile liner with optional 1" liner in eccentric or concentric reducers.

    We recommend blind flange arrangements over mechanical seal options at the sump entry point as being more cost effective and operational at 10+ years.

    The CTI Pump to Pipe Adapter replaces rubber expansion pump to pipe connection. The ability to make 45 degree discharges angles directly off pumps pumping 3" sand laden slurry has been standard for years with no failures of pump heads or pump adapters.

    Click here to watch the "CTI Company information video"